Equipment Operation: Equipment General Maintenance
|
|
|
While the application equipment
is designed to run for extended periods of time without any major overhauls
there are some basic general maintenance procedures that must be followed.
These procedures, if done properly and on a timely basis, will help insure
smooth operation and performance with the application equipment. |
|
|
Proportioning Pump |
|
|
|
|
Drum Pumps / Material Supply Pumps |
|
|
|
|
Spray Guns |
|
|
|
|
For long periods of shut down or non-spraying, the proportioning unit should be actuated at least once every two weeks. Material can be flushed through the open hoses. CAUTION! DO NOT BLEED TO HOSE PRESSURE TO 0 PSI!!! Leave at least 1000 – 1500 psi static pressure after putting machine in the retract position.
|
|
|
|